Our Project Portfolio

Battery Storage Projects
in Austria

Blackvolt builds the infrastructure backbone of Austria's energy transition. The portfolio spans utility-scale battery storage projects across multiple Austrian federal states, from the first BESS asset in construction to a development pipeline exceeding 2 GWh. Every project passes through the full Blackvolt value chain: site analysis, permitting, grid connection, construction, and long-term operations.

Portfolio at a Glance

Blackvolt operates the highest-maturity utility-scale battery storage portfolio in the Austrian market. Project diversification across development phases secures continuous build-out and predictable milestones for partners and investors.

54 MW

In Construction

251 MW

Ready to Build

950 MW

Late-Stage Pipeline

2,500 MW

Total Portfolio

> 600 MWh Permitted

> 2 GWh Pipeline

Over thirty projects sit in active development. Site selection follows the same criteria across the portfolio: grid capacity, secured zoning, viable revenue mix, and long-term operability.

Battery storage revenue models

Oberndorf: First BESS Project in Construction

In Construction

18 MW

Output

36 MWh

Capacity

Oberndorf near Salzburg, Salzburg federal state

Location

Oberndorf is Blackvolt's first battery storage project in active construction and the operational proof point for the company's end-to-end execution capability. The site was selected on the basis of a structured site analysis: optimal grid connection, fully permitted, and a commercially attractive position within the Austrian balancing services market.

With 18 MW of output and 36 MWh of capacity, the Oberndorf battery storage facility will participate in the Austrian electricity market post-commissioning. Revenue generation will follow a diversified stack across balancing energy, wholesale arbitrage, and additional flexibility products. Blackvolt coordinates the full construction phase. Post-commissioning, operations transfer to Blackvolt Operations and Management GmbH, the in-house subsidiary that handles technical and commercial asset management.

Oberndorf battery storage project site visualization
Oberndorf battery storage location on the Austria map

Wöllersdorf: Largest Single Project, In Construction

In Construction

36 MW

Output

72 MWh

Capacity

Wöllersdorf, Lower Austria

Location

Wöllersdorf is the largest single project in the current Blackvolt portfolio: 36 MW of output and 72 MWh of capacity. The Lower Austria site is in construction — all required permits are issued, land tenure is finalized, and the grid connection is contractually secured.

The strategic relevance of Wöllersdorf sits in its scale. Double the output and double the capacity of Oberndorf demonstrate the scalability of the Blackvolt operating model. The Lower Austria location complements the portfolio geographically and adds grid capacity in one of Austria's strongest industrial regions.

Wöllersdorf battery storage project visualization, Lower Austria
Wöllersdorf battery storage location on the Austria map

Pipeline: 30+ Sites in Development

Battery storage pipeline Austria — 30+ project sites in development

> 30

Projects

> 600 MWh

Permitted

> 2 GWh

Pipeline

Blackvolt develops more than thirty battery storage projects across Austrian federal states. The pipeline carries more than 600 MWh of already-permitted capacity and exceeds 2 GWh in advanced development. At 2,500 MW total portfolio, Blackvolt holds the highest-maturity BESS development position in the Austrian market.

Site selection follows a systematic protocol. Every candidate is evaluated against grid capacity, land availability, regulatory status, and commercial viability. Only sites that clear all four criteria enter active development. The methodology protects project quality independent of portfolio scale.

The pipeline expands continuously. New sites enter evaluation, qualified candidates move into development, and mature projects progress toward Ready-to-Build status.

Battery storage land lease and site partnerships

Project Phases

Every Blackvolt battery storage project moves through a defined development sequence with transparent milestones across three phases.

In Development

01

The site is identified, feasibility analysis is underway, and permitting plus land tenure are in progress. More than thirty projects currently sit in this phase.

Ready to Build

02

All required permits are issued, the grid connection is contractually secured, and land tenure is finalized. The project is ready for construction start. 251 MW of the Blackvolt portfolio have reached this status.

In Construction

03

Construction is active and the asset is being built. Blackvolt coordinates and supervises the full construction process. After commissioning, Blackvolt Operations and Management GmbH takes over technical and commercial operations. 54 MW are currently in this phase.

End-to-end project development